Thai Global FreightHow Is VGM Weighed, and When Should You Schedule It Before Gate-In?
Verified gross mass can be obtained by weighing the packed container or by summing item weights. Here's how each method works and how to time it before the terminal gate-in deadline.
On this page
- 01What VGM Is and Why It's Required
- 02Method 1: Weighing the Packed Container
- 03Method 2: Summing Item Weights
- 04Choosing Between Method 1 and Method 2
- 05Who Is Responsible for Submitting VGM
- 06Timing VGM Before the Terminal Gate-In Cutoff
- 07What Happens If VGM Is Missing or Late
- 08VGM for Consolidated and Multi-Party Shipments
Quick Answer
VGM (Verified Gross Mass) can be obtained in one of two ways: Method 1, weighing the fully packed and sealed container as a single unit on a calibrated weighbridge or crane scale, typically at a port terminal, container yard, or truck weighbridge; or Method 2, weighing each item or package inside the container individually, summing those weights, and adding the container's own tare weight. Either method produces a figure that must be submitted to the shipping line before a published VGM cut-off, which is a separate deadline from — and usually earlier than — the general container cut-off for the vessel. Because a container without an accepted VGM on file is typically not loaded, it's worth scheduling the weighing step early enough to allow time for the figure to be submitted, confirmed, and logged against the container number before that cut-off passes.
Key Takeaways
- VGM is the confirmed total weight of a packed container, required before it can be loaded onto a vessel.
- Method 1 weighs the whole packed container at once; Method 2 sums individual item weights plus the container's tare weight.
- The VGM cut-off is a separate deadline from the general container cut-off, and is usually earlier.
- The shipper named on the bill of lading is legally responsible for VGM submission, even when a forwarder handles the logistics of getting it done.
- A container missing a valid VGM by the cut-off is typically excluded from the loading plan.
- Choosing between the two methods usually comes down to which weighing step fits most naturally into the existing packing and trucking routine.
A booking confirmation for an FCL shipment almost always includes a VGM cut-off date sitting a day or two ahead of the general container cut-off, and for shippers unfamiliar with the requirement, that earlier date can be easy to miss until it's too late to fix. VGM isn't optional paperwork — it's a weight figure the terminal needs before it will include a container in the vessel's loading plan, and getting it right requires understanding which of the two accepted methods applies to a given packing situation, and building enough lead time into the schedule to actually submit it before the cut-off closes.
The mechanics themselves are straightforward once separated from the deadline pressure: there are exactly two ways to arrive at a VGM figure, both are equally valid, and the choice between them usually comes down to logistics rather than accuracy. What causes problems is timing, not the weighing itself.
Key points at a glance
VGM (Verified Gross Mass) is the confirmed total weight of a packed container, required before it can be loaded onto a vessel.
There are two accepted methods for obtaining VGM: weighing the whole packed container, or summing the weight of its contents plus the tare weight.
VGM must reach the shipping line and terminal before a published cut-off, which is separate from and usually earlier than the general container cut-off.
Responsibility for submitting VGM legally rests with the shipper named on the bill of lading, though the actual weighing task is often coordinated with a forwarder or trucker.
A container without a valid VGM on file by the cut-off is typically not loaded, which can mean missing the intended vessel.
What VGM Is and Why It's Required
VGM stands for Verified Gross Mass — the total weight of a packed and sealed container, including the cargo, packing materials, dunnage, and the container itself. It's a figure the carrier and terminal need in order to plan how a vessel is loaded, because the position a container is stowed in — which deck, which tier, next to which other containers — depends partly on how heavy it actually is compared with what was declared at booking. An inaccurate weight can affect vessel stability calculations and container stacking safety, which is why the figure has to be independently verified rather than estimated.
The requirement applies to containerized cargo moving by sea, and it sits alongside — but separately from — other pre-shipment steps like booking confirmation, customs declaration, and the shipping instruction. A shipment can have a complete shipping instruction and a confirmed booking and still not be loadable if VGM hasn't been submitted and accepted by the relevant cut-off.
Method 1: Weighing the Packed Container
Method 1 weighs the container as a single unit once it's fully packed and sealed, using a calibrated weighbridge, a crane fitted with load cells, or another certified weighing device. This is often the more convenient option when the container is going to pass over a weighbridge anyway — for example, a truck weighbridge on the route to the port, or a weighing station at the container yard or terminal itself. The reading already includes the tare weight of the container, so nothing further needs to be added.
Because the weighing happens after the container is sealed, Method 1 captures the actual as-packed state, including anything that might have shifted or been added during the final stages of loading. This can make it a more reliable choice for consolidated shipments or situations where more than one party contributed cargo to the same container, since it doesn't depend on every contributor's individual weight figures being accurate or complete.
Method 1 vs. Method 2 for obtaining VGM
Method 1 — weigh the packed container
- The fully loaded, sealed container is weighed as one unit on a calibrated weighbridge or crane scale
- Typically done at a port terminal, container yard, or truck weighbridge on the way to the port
- Gives a single reading that already includes the tare weight of the container itself
Method 2 — sum item weights plus tare
- Each item, pallet, or package inside the container is weighed individually, then all weights are added together
- Typically done at the shipper's own warehouse or packing facility before the container is sealed
- Requires adding the container's tare weight (shown on the container itself) to the summed cargo weight

Method 2: Summing Item Weights
Method 2 arrives at VGM by weighing every item, pallet, or package inside the container individually, adding those weights together, and then adding the container's tare weight — the empty weight of the container itself, which is stamped on the container's door or frame (usually shown as "Tare" followed by a figure in kilograms). This method suits shippers who already weigh and record cargo as part of their own packing process, since it doesn't require a separate weighbridge trip once packing is finished.
The accuracy of Method 2 depends entirely on the accuracy and completeness of the individual weight records. Anything left off the tally — extra packing material, a pallet weighed before a strap or wrap was added, a last-minute item tucked in near the door — will make the final figure too low. Because of that sensitivity, Method 2 works best when the shipper has disciplined weighing procedures already in place at the point of packing, rather than relying on estimated or nominal weights for individual items.
Choosing Between Method 1 and Method 2
Neither method is inherently more accurate; the choice mostly comes down to which one fits the existing flow of packing and trucking without adding an unnecessary step. If the container is already going to pass a weighbridge on its way to the port — a common setup for many trucking routes in Thailand — Method 1 adds no extra stop and gives a single, terminal-ready figure. If the shipper packs at its own facility and already tracks item weights precisely as part of inventory or export documentation, Method 2 can save a weighbridge trip and keep the process entirely in-house.
Some shippers use a mix depending on the shipment: straightforward, single-consignor loads with reliable item weight records go through Method 2, while consolidated loads, unusually shaped cargo, or shipments where confidence in item-level weights is lower go through Method 1 for a definitive reading. Either way, it's worth deciding on the method well before packing starts, since Method 2 in particular requires weighing discipline throughout the packing process rather than as an afterthought.
Typical steps to get a VGM on file before gate-in
- 1
1. Decide which method will be used
Confirm whether the container will be weighed whole at a weighbridge or built up from individual item weights
- 2
2. Pack and weigh accordingly
Complete packing, then take the weighbridge reading or record each item's weight as packing progresses
- 3
3. Submit VGM to the carrier
The party responsible submits the figure to the shipping line, usually through the forwarder or booking system
- 4
4. Terminal records it against the container number
Once accepted, VGM is logged against the container so it clears the loading plan checks

Who Is Responsible for Submitting VGM
The shipper named on the bill of lading carries legal responsibility for ensuring an accurate VGM is submitted, regardless of who actually performs the weighing or handles the paperwork. In practice, the actual weighing and submission steps are often coordinated by a forwarder, a trucker with weighbridge access, or the packing facility itself, but delegating the task doesn't shift where the responsibility sits if the figure later turns out to be wrong.
Because of that, it's worth confirming explicitly — as part of booking a shipment — who will weigh the container, which method will be used, and how the figure will reach the shipping line before the cut-off. A forwarder handling the full booking will usually build this into the shipment plan automatically, but a shipper booking directly or coordinating multiple vendors for a single container should treat VGM as its own checklist item rather than assuming it will happen as a byproduct of other steps.

Timing VGM Before the Terminal Gate-In Cutoff
The VGM cut-off and the container gate-in cut-off are two different deadlines, and the VGM cut-off typically falls earlier, since the terminal needs the weight figure on file before it will accept the container into the yard for loading. Working backward from the VGM cut-off given on the booking confirmation, a shipper needs enough time to finish packing, complete the weighing (whichever method is used), and have the figure submitted and processed by the carrier — not just sent, but confirmed as received and matched to the correct container number.
Building in a buffer matters because each of those steps can slip: packing can run later than planned, a weighbridge can have a queue, and submission through a booking portal or via a forwarder can take longer than expected if the figure arrives close to a deadline that many other shippers are also racing to meet. Scheduling the weighing step at least a day ahead of the published VGM cut-off, rather than aiming to hit it exactly, gives room to catch and correct an error — a mismatched container number, a transposed digit, a missing tare weight — before it becomes a missed sailing.
Choosing a weighing method for your shipment
Container is trucked past a weighbridge on the way to the port
Method 1 is often the simpler choice — the weighing happens as part of the existing trucking route
Shipper packs the container at its own facility with known item weights
Method 2 avoids a separate weighbridge trip if item-level weights are already tracked accurately
Cargo is mixed, consolidated, or loaded by multiple parties
Method 1 can be more reliable, since it captures the actual final packed state in one reading regardless of who packed what
What Happens If VGM Is Missing or Late
A container without an accepted VGM on file by the cut-off is typically excluded from the terminal's loading plan for that vessel, which in practice means the container doesn't sail as scheduled. Depending on how close to departure the gap is discovered, the container may need to wait for the next available sailing, which pushes back the whole shipment's arrival and can affect any onward commitments tied to the original schedule.
Because the consequence is a missed vessel rather than a fine or penalty that can simply be paid, VGM deserves the same scheduling discipline as other hard cut-offs in the booking — customs filing, container cut-off, and document submission. Building VGM into the shipment checklist from the start, rather than treating it as a formality to handle once packing is already underway, is the most reliable way to avoid discovering the gap only when it's too late to correct.

VGM for Consolidated and Multi-Party Shipments
A container carrying cargo from a single shipper is the simplest VGM scenario, but consolidated shipments — where an LCL consolidator or NVOCC combines cargo from several different shippers into one container — add a layer of coordination that's worth understanding separately. In this setup, the party responsible for VGM submission to the shipping line is typically the consolidator, who holds the master bill of lading for the container as a whole, rather than any individual shipper whose goods make up only part of the load.
Because of that, Method 1 — weighing the fully packed container as a single unit — is often the more practical choice for consolidated cargo, since it produces one definitive figure regardless of how many individual shippers contributed to the load, without needing to collect and verify separate item-level weights from each of them. A shipper booking LCL space doesn't usually need to submit VGM directly, but it's still worth confirming with the consolidator or forwarder that VGM will be handled and submitted on schedule, since the same gate-in consequences apply to a consolidated container as to any other if the figure is missing by the cut-off.
Common Mistakes
- Confusing the VGM cut-off with the general container cut-off and submitting the weight too late for the terminal's loading plan.
- Using Method 2 without weighing everything that went into the container, including packing materials and last-minute additions.
- Forgetting to add the container's tare weight when using Method 2, resulting in a figure that's too low.
- Assuming the forwarder will handle VGM without confirming which method, timing, and responsibility have actually been agreed.
What You Need to Prepare
- A decision on which VGM method (Method 1 or Method 2) will be used, made before packing begins
- Access to a calibrated weighbridge or certified weighing equipment for whichever method is chosen
- The container's tare weight, taken from the marking on the container door or frame, if using Method 2
- The VGM cut-off date and time from the booking confirmation, confirmed as separate from the general container cut-off
Frequently Asked Questions
Where can I weigh a container for VGM in Thailand?
Depending on the method chosen, weighing can happen at a truck weighbridge on the route to the port, a weighing station at the container yard or terminal, or at the shipper's own packing facility if summing item weights under Method 2.
Is Method 1 or Method 2 more accurate?
Neither is inherently more accurate — both are accepted methods. Method 1 captures the actual as-packed state in one reading, while Method 2's accuracy depends on how completely and precisely individual item weights are recorded.
Who is legally responsible if the VGM is wrong?
The shipper named on the bill of lading carries the responsibility, even if a forwarder or trucker actually performed the weighing on their behalf.
How much earlier is the VGM cut-off than the container cut-off?
This varies by carrier and terminal and is stated on the specific booking confirmation. It's typically earlier than the general container cut-off, so it's worth checking the exact figure for each booking rather than assuming a standard gap.
What happens if VGM is submitted after the cut-off?
A container without an accepted VGM by the cut-off is typically excluded from the loading plan for that vessel, which can mean waiting for the next available sailing.