Skip to content
Trade Lane Guides
Gdansk port container terminal, illustrating Importing from Poland to Thailand: Routes, EU Export and Thai ClearanceThai Global Freight

Importing from Poland to Thailand: Routes, EU Export and Thai Clearance

Import from Poland to Thailand as of Nov 2026: EU export declaration and EORI, Gdansk, Gdynia or hub routing, air freight, no EU-Thailand FTA, Thai clearance.

Author: Bob Kanokphon ThongdeeBob Kanokphon ThongdeeReviewed by: Thai Global Freight Editorial TeamPublished: 2026-11-25Updated: 2026-11-25Last verified: 2026-11-25
On this page
  1. 01Can a Thai company import from Poland, and how does the lane work?
  2. 02What does the Polish side need to do: EU export declaration and EORI?
  3. 03Which Incoterm should I use when buying from Poland?
  4. 04Should cargo sail from Gdansk or Gdynia, or go via Hamburg or Rotterdam?
  5. 05When does air freight from Poland make sense?
  6. 06Is there a Thailand–EU free trade agreement, and what origin document is needed?
  7. 07What does Thailand require when the cargo arrives?
  8. 08What usually goes wrong, and in what order should I plan the first order?
  9. 09When should I talk to a freight forwarder, and what can Thai Global Freight do?

Quick Answer

To import from Poland to Thailand, the Polish supplier lodges an electronic EU export declaration under an EORI number, the cargo leaves the EU customs territory by sea from Gdansk, Gdynia or a North Sea hub such as Hamburg or Rotterdam, or by air, and a licensed Thai customs broker then clears it with the Thai Customs Department under the correct HS code. As of November 2026 the EU and Thailand have no free trade agreement in force, so do not budget a duty preference. Food, cosmetics and machinery may need extra Thai permits, so check before ordering.

Key Takeaways

  • Poland is inside the EU single market, but leaving the EU customs territory still needs an electronic export declaration, normally lodged by the exporter or declarant.
  • An EORI number is the customs identifier used for trade with non-EU countries; Polish authorities state that a company importing from or exporting to non-EU countries needs one.
  • Cargo can sail from Polish ports such as Gdansk or Gdynia, or move first to a hub like Hamburg or Rotterdam; the quote should name the actual route and any transhipment point.
  • As of November 2026 the European Commission describes the EU-Thailand free trade agreement as still under negotiation, so an EUR.1 certificate does not currently lower Thai duty.
  • On the Thai side the HS code, importer registration and any product-specific permit decide the timeline more than the sea or air leg does.

Can a Thai company import from Poland, and how does the lane work?

Yes. Importing from Poland is ordinary commercial trade: a Polish supplier sells goods from inside the European Union, a freight forwarder moves them to a seaport or airport, and a licensed Thai customs broker clears them with the Thai Customs Department. This guide reflects the position as of November 2026 and is written for importers who want to understand the whole chain before the first order.

The lane has three features that shape almost every decision. First, Poland is a member of the EU single market, so goods move freely between EU countries, but the moment cargo leaves the EU customs territory for Thailand it becomes an export and needs an EU export declaration. Second, Poland has a Baltic coastline, so cargo can sail from Polish ports, but many ocean services to Asia are built around larger North Sea hubs, so the routing question is real. Third, the EU and Thailand do not have a free trade agreement in force, so the Thai duty treatment follows Thailand's standard rules.

If you ship the other way, from Thailand to Poland, that is a different lane with different documents; our guide on shipping from Thailand to Poland covers it. Here we stay on the import side: what the Polish exporter must do, which route to choose, and what Thailand will ask for at arrival.

What does the Polish side need to do: EU export declaration and EORI?

A Polish supplier cannot simply hand the container to a carrier. Under the EU's export procedure, the exporter or declarant presents the goods and submits an export declaration at the customs office responsible for where the exporter is established or where the goods are packed or loaded. The declaration must be electronic, through the Automated Export System, known as AES. The customs office releases the goods and passes the details to the customs office of exit, which checks them against the declaration and supervises their departure; the goods remain under customs supervision until they leave the EU customs territory. Carriers also give customs advance information on goods leaving the EU. In Poland, the PUESC portal of the National Revenue Administration offers the export declaration service through the AES system.

An EORI number, short for Economic Operators Registration and Identification, is the customs identifier used for trade with non-EU countries. Polish authorities state that a company importing from or exporting to countries outside the EU needs one, that it is used only for customs purposes and that it is valid across the EU. A Polish company obtains it in Poland. As the Thai importer you do not apply for an EU EORI just to buy goods, but you should ask the supplier or their forwarder to confirm that the party lodging the declaration holds one and to tell you which party that is.

Who does this work depends on the Incoterm. With EXW the buyer's side may need a Polish representative to lodge the export declaration, which is a common source of delay; with FCA, FOB, CIF or similar terms the seller normally takes the export formalities. Settle this in the contract, not after the cargo is packed.

Before the cargo leaves Poland

Checklist of items to settle on the Polish side: who lodges the EU export declaration, that the exporter or declarant holds an EORI number, which customs office handles exit, the Incoterm and named place, matching invoice and packing list, and the origin information the Thai broker needs.
  • Who lodges the EU export declaration, agreed in writing

  • Exporter or declarant has an EORI number

  • Customs office of exit identified for the chosen route

  • Incoterm and named place match the quote

  • Invoice, packing list and transport document agree

  • Origin information and HS description ready for the Thai broker

Gdansk port container terminal — photo 1 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance
Gdansk port container terminal — photo 1 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance — Thai Global Freight

Which Incoterm should I use when buying from Poland?

The Incoterm decides who pays for and controls each stage, and on this lane it also decides who handles EU export formalities. Choose by how much control you want over the European leg.

Choose FOB or FCA at a named place when you have a forwarder who can control the ocean booking and you want the Polish supplier to deliver the cargo with export clearance done. Choose CIF or CIP when you want the seller to arrange the main carriage and insurance and you accept that the route and carrier are theirs to select, which makes it important to ask for the routing in writing. Choose EXW only when your forwarder has a trusted Polish agent who can collect the cargo and lodge the export declaration; otherwise EXW leaves the exporter's customs role unclear.

Whatever the term, name the place precisely, such as a terminal or a warehouse, because a vague named place causes disputes about who pays for pre-carriage, terminal handling and waiting time. If you are unsure, our guides on EXW versus FOB and on Incoterms and cargo insurance explain the risk transfer in detail, and the Incoterms selector tool can help you compare options. Cargo insurance should cover the entire journey including any transhipment stage and any road, rail or barge pre-carriage in Europe.

Should cargo sail from Gdansk or Gdynia, or go via Hamburg or Rotterdam?

There is no single correct answer; the right route is the one the carrier's actual service supports for your cargo, so ask for it in the quote. Here is how to think about it.

Gdansk is the larger of the two Polish ports in the Gdansk Bay area. The Port of Gdansk presents itself as the largest container port in the Baltic, with a 17 metre deepwater port, an Outer Port that takes the largest ocean-going ships, and road and rail connections. Gdynia is the neighbouring Baltic port. Leaving from either keeps the pre-carriage from a Polish supplier short, which is attractive for supplier locations in the north or centre of Poland.

The question to ask is whether the booking is a direct ocean service or a feeder service. Many Asia routes call at North Sea hubs, so cargo from a Baltic port may be transhipped there. Transhipment is not a fault, but it adds a handover, a possible delay point and a place where documents and insurance must follow the cargo. The alternative is to truck, rail or barge the container to a hub such as Hamburg or Rotterdam and board the ocean vessel there. That adds pre-carriage inside Europe and may suit cargo with a specific ocean service requirement.

The decision rule is simple. Choose a Polish port when your supplier is near it and the carrier shows a clear onward service to Laem Chabang. Choose a hub when the supplier is closer to it, when the ocean service you need only calls there, or when the quote is clearly better structured. Ask which port and terminal, whether the rate is door-to-port or port-to-port, and where the EU exit formalities will be completed. Rail between China and Europe is a separate topic and is not relevant to a Polish supplier shipping to Thailand.

Polish port departure versus routing via a North Sea hub

Two-column comparison. Leaving from a Polish port such as Gdansk or Gdynia keeps the pre-carriage short but may mean a feeder or transhipment leg before the ocean vessel. Routing via a North Sea hub such as Hamburg or Rotterdam adds road, rail or barge pre-carriage in Europe but may put the container on an ocean vessel sooner. The right choice depends on the carrier's actual service and the quote.

Via a Polish port

  • Gdansk or Gdynia on the Baltic coast
  • Short truck or rail haul from the supplier
  • Ask whether the service is direct or feeder
  • Transhipment point must be named in the quote

Via a hub such as Hamburg or Rotterdam

  • Longer pre-carriage inside Europe
  • Road, rail or barge leg to the hub
  • Can suit cargo that needs a specific ocean service
  • Check where EU exit formalities happen

When does air freight from Poland make sense?

Air freight suits urgent, high-value, light or perishable cargo, and samples that a buyer needs before committing to a larger order. The pattern on this lane is that cargo leaves from an airport in Poland, often Warsaw, or is trucked to a larger European air hub, and then flies to Bangkok. Which airport is used depends on the airline and the forwarder's network, so confirm whether your quote is airport-to-airport or door-to-door and whether the first leg is a road feeder service.

Air freight is priced on chargeable weight, which is the higher of actual weight and volumetric weight, so bulky light cargo can cost more than its scale weight suggests; our guides on chargeable weight and on air freight Incoterms explain this. The EU export declaration still applies to air cargo, and the airline needs the air waybill details to match the invoice and packing list. Dangerous goods, batteries and temperature-controlled products need declarations before the booking is accepted.

Choose air when the value or urgency justifies it and the cargo is small enough for the airline's limits. Choose sea when the cargo is heavy, bulky or not time-critical. For goods that look small but are really a business shipment, avoid courier parcels unless you have checked the Thai rules for low-value parcels, because commercial goods are treated differently from personal purchases.

Container ship cargo port — photo 2 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance
Container ship cargo port — photo 2 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance — Thai Global Freight

Is there a Thailand–EU free trade agreement, and what origin document is needed?

As of November 2026, the European Commission describes the EU–Thailand free trade agreement as still being negotiated. Negotiations were launched in March 2013, put on hold in 2014, and relaunched in March 2023. A separate Partnership and Cooperation Agreement was signed in December 2022, but that is not a free trade agreement. We therefore treat Thailand as having no FTA in force with the EU and do not claim any preferential duty on this lane. Check the Commission's Thailand page before relying on any future change.

In practice this means an EUR.1 movement certificate, which the EU uses to prove origin under its own trade agreements, does not currently reduce Thai import duty. Do not budget a duty saving because a supplier offers one. Thailand does have other agreements with other partners, and the origin of the goods, not the shipping country, decides any preference, so the question to settle is where the goods were really made. A Polish supplier may be a trader reselling goods produced elsewhere, which matters for origin declarations and for any trade remedy applied to the product.

What the Thai broker will still ask for is the commercial invoice with accurate origin, a packing list, the transport document, and any product-specific permit. Some importers also ask for a certificate of origin as a commercial document even without a duty benefit, for example because a letter of credit requires it; agree this with the supplier before shipment. Our guides on certificate of origin types and on RCEP explain how origin works under other arrangements.

What does Thailand require when the cargo arrives?

On the Thai side the process is the same whatever the origin. The importer must be registered to import, the goods must be declared to the Thai Customs Department under the correct HS code, duty and tax are assessed on that classification and the customs value, and any product-specific permit must be in place. In practice a licensed customs broker, or shipping agent, files the declaration on your behalf under a power of attorney. The Thai Customs Department website lists importer and exporter registration, the tariff search, advance classification rulings, prohibited or licensed goods, and electronic permits through the Thailand National Single Window. Our guides on the Thai import process, the import documents checklist and what an HS code is cover the mechanics.

The documents are the commercial invoice, packing list, bill of lading or air waybill, and any certificate or permit that the product category requires. The HS code, or Harmonized System code, is the international product classification that decides which duty rate and which controls apply, so agree the description and code with the supplier and broker before the goods ship; if the classification is uncertain, an advance ruling from the Customs Department can remove the doubt.

Then come the product-specific controls. Packaged food and drinks go through the Thai Food and Drug Administration rules, so see our guides on importing food and beverages and on FDA food facility registration. Cosmetics have their own rules; see the cosmetics import guide. Machinery and electrical equipment may be subject to mandatory product standards; see our guide on TISI mandatory standards. Other permits are summarised in our import permits guide. Cargo that arrives without the right permit can be held at the port, so the time to find out is before you order, not after the container is at Laem Chabang.

Typical Polish exports and the Thai checkpoint to plan for

Matrix of cargo types and what to plan for in Thailand: packaged food and drinks need a check with the Thai Food and Drug Administration route and labelling; cosmetics need a check with the cosmetics rules before ordering; machinery and electrical equipment need classification and a check for mandatory standards.
CargoMain Thai checkpointPlan before ordering
Packaged food and drinksFood and Drug Administration rules and labellingExact product list, ingredients and label draft
Cosmetics and personal careCosmetics notification and import rulesFormula, brand owner and importer role
Machinery and electrical equipmentClassification, possible mandatory standardsModel numbers, technical data and purpose of use
Container ship cargo port — photo 3 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance
Container ship cargo port — photo 3 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance — Thai Global Freight

What usually goes wrong, and in what order should I plan the first order?

The common failures on this lane are administrative rather than physical. A supplier assumes the buyer lodges the export declaration under EXW and nobody does. The invoice describes the goods one way and the packing list another. The quote says port-to-port but the buyer assumed door-to-port, so European pre-carriage appears as a surprise. A transhipment is not mentioned and the cargo insurance does not cover it. A supplier sends an EUR.1 and the buyer budgets a duty saving that does not exist. Food or cosmetics are ordered before checking Thai rules and are held at the port.

A sensible order of work avoids all of these. Start with the product: write the exact goods, the expected HS code, and the producer and country of manufacture. Then ask whether Thai agencies require a permit, using our import permits guide as a starting point and confirming with a broker. Next fix the commercial terms: Incoterm, named place, payment terms, and who lodges the EU export declaration. Then choose the route, sea or air, Polish port or hub, and ask in writing for the planned routing and any transhipment point. Before the cargo departs, have the broker review the invoice, packing list and draft transport document. On arrival, the broker files the Thai declaration, pays duty and tax, and arranges release and delivery.

A landed cost calculation helps you see the whole picture before committing; our landed cost calculator and the guide on how import duty and VAT are calculated in Thailand show the structure without inventing numbers, so ask for a quote for the actual figures.

When should I talk to a freight forwarder, and what can Thai Global Freight do?

Talk to a forwarder before you pay the supplier's deposit, not after the goods are packed. At that stage a forwarder can compare the Polish port and hub options, tell you which terminals and services are realistic for your supplier's location, and flag any permit issue on the Thai side while it is still cheap to change course.

Thai Global Freight can help on the Thai side and coordinate the rest of the chain. That includes sea freight and air freight arrangements, FCL or LCL consolidation when your cargo does not fill a container, customs clearance in Thailand through licensed brokers, and door-to-door delivery to your warehouse. Our import services page describes how these parts fit together. Send us the product description, quantity, supplier location in Poland, the Incoterm you are considering, and the destination in Thailand, and ask for a quote; we will tell you what we need to confirm and what the quote includes and excludes.

For any specific permit, classification or tax question, the authoritative answer comes from the relevant Thai agency or a licensed customs broker, and we will say so rather than guess.

Container ship cargo port — photo 4 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance
Container ship cargo port — photo 4 for Importing from Poland to Thailand: Routes, EU Export and Thai Clearance — Thai Global Freight

Common Mistakes

  • Buying EXW without agreeing who lodges the EU export declaration, so nobody in Poland is clearly responsible for the export formalities.
  • Budgeting a duty saving because the supplier sends an EUR.1 certificate, when as of November 2026 there is no EU–Thailand free trade agreement in force.
  • Assuming a Polish port departure is a direct ocean service, then discovering a transhipment the insurance and quote did not mention.
  • Letting the invoice, packing list and transport document describe slightly different goods or quantities.
  • Ordering food, cosmetics or machinery before checking the Thai permit, label and standard requirements for the exact product.

What You Need to Prepare

  • A Thai importer registration and a licensed customs broker with a power of attorney.
  • The exact product description, expected HS code, and the producer's name and country of manufacture.
  • A written agreement on the Incoterm, the named place, and who lodges the EU export declaration and holds the EORI number.
  • The planned route in writing: Polish port or hub, direct or feeder, and any transhipment point.
  • Commercial invoice, packing list and bill of lading or air waybill that agree with each other.
  • Any Thai permit, label approval or standards certificate the product category requires, confirmed before ordering.
  • Cargo insurance that covers the whole journey, including any road, rail or barge pre-carriage and transhipment.

Frequently Asked Questions

Do I need an EORI number to import from Poland to Thailand?

Usually the Polish side needs it, not you. An EORI number is the EU customs identifier for trade with non-EU countries, and Polish authorities state that a company importing from or exporting to non-EU countries needs one. The exporter or declarant lodging the EU export declaration should hold it. As a Thai buyer you generally do not apply for an EU EORI just to purchase goods, but ask the supplier to confirm who lodges the declaration.

Is there a free trade agreement between Thailand and the EU in November 2026?

No agreement is in force. The European Commission describes the EU–Thailand free trade agreement as still under negotiation, with talks launched in March 2013, paused in 2014 and relaunched in March 2023. The Partnership and Cooperation Agreement signed in December 2022 is a separate agreement and is not an FTA. Check the Commission's Thailand page for any change before relying on a preference.

Does an EUR.1 certificate lower Thai import duty?

Not at present. An EUR.1 is the EU's proof of origin under its own trade agreements, and with no EU–Thailand FTA in force it does not currently lower Thai duty. Do not budget a saving because a supplier offers one; ask your customs broker which origin document, if any, Thai Customs would accept for your goods.

Should I ship from Gdansk, Gdynia or via Hamburg or Rotterdam?

It depends on your supplier's location and on the carrier's actual service. A Polish port keeps European pre-carriage short but may involve a feeder or transhipment before the ocean vessel; a hub adds road, rail or barge pre-carriage but can suit a specific ocean service. Ask for the planned port, terminal, direct or feeder status and any transhipment point in the quote.

Can I import food or cosmetics from Poland without extra permits in Thailand?

Usually not. Packaged food and drinks and cosmetics are controlled products in Thailand, and the exact requirements depend on the product. Check our guides on importing food and beverages and on cosmetics, and confirm with a licensed broker or the relevant agency before ordering, because cargo without the right permit can be held at the port.

Who handles EU export clearance if I buy EXW from a Polish supplier?

It must be agreed, because EXW does not make it automatic. The export declaration is lodged by the exporter or declarant, and under EXW the buyer's side may need a Polish representative to do it. If you have no such agent, FCA or FOB at a named place is usually simpler because the seller takes the export formalities.

Is shipping from Thailand to Poland the same process in reverse?

No. The reverse lane has Thai export paperwork and EU import rules, with different parties responsible at each end. Our guide on shipping from Thailand to Poland covers that direction.

Freight Forwarder Thailand

Ready to plan your next shipment?

CallLINEGet a Quote