Skip to content
China–Thailand Trade
Aluminium profiles shipping cargo, illustrating Importing Aluminium Profiles from China to ThailandThai Global Freight

Importing Aluminium Profiles from China to Thailand

Import aluminium profiles from China to Thailand as of November 2026: anti-dumping check, HS code, Form E, packing, container choice, loading plan, clearance.

Author: Bob Kanokphon ThongdeeBob Kanokphon ThongdeeReviewed by: Thai Global Freight Editorial TeamPublished: 2026-11-24Updated: 2026-11-24Last verified: 2026-11-24
On this page
  1. 01What does importing aluminium profiles from China to Thailand involve?
  2. 02Is there anti-dumping duty on aluminium profiles from China?
  3. 03What HS code and documents do aluminium profiles need?
  4. 04How are aluminium profiles packed for sea freight?
  5. 05Which container suits long profiles, and when is LCL acceptable?
  6. 06How should the container be loaded and lashed?
  7. 07Incoterms: who does what on a profile order?
  8. 08What happens on arrival in Thailand and at the site?
  9. 09What is a sensible sequence, and when should you talk to a forwarder?

Quick Answer

Importing aluminium profiles (extruded aluminium sections) from China to Thailand means three things done in order: check whether the Thai Department of Foreign Trade applies an anti-dumping measure to aluminium extrusions from China for your producer, agree the HS code and any Form E preference with a licensed customs broker, then plan packing and the container around the length and weight of the sections. As of November 2026, the DFT trade-remedy list shows a measure in force on aluminium extrusions of Chinese origin, so check the producer before you order.

Key Takeaways

  • Check the duty position before the order, not at the port: the Thai Department of Foreign Trade lists an anti-dumping measure on aluminium extrusions of Chinese origin as in force as of November 2026.
  • Profiles are long and light for their length, so the container choice is driven by section length and bundle layout as much as by weight.
  • A packing list that names every section code, length and bundle count prevents most quantity and finish disputes.
  • Surface damage, bending and moisture are the real loss risks; film, interleaving paper, even support and dry packing control them.
  • Plan the last mile with the first: a long container needs a site where it can be unloaded safely and a truck that can reach it.

What does importing aluminium profiles from China to Thailand involve?

Aluminium profiles are aluminium sections made by extrusion: a heated billet is pushed through a die to create a constant cross-section such as a window frame, a door track, a curtain-wall mullion, a solar-panel rail or a structural T-slot. Contractors, window and door fabricators, furniture makers and traders in Thailand often buy them from Chinese mills because the range of dies and surface finishes is wide. This guide is written as of November 2026 and follows the order a careful buyer works in.

An import of profiles has four layers. The first is the legal layer: the Thai Customs Department classifies the goods under an HS code, the Department of Foreign Trade (DFT) runs the trade-remedy list, and Thailand's industrial standards body, the Thai Industrial Standards Institute (TISI), publishes product standards. The second is the commercial layer: Incoterms, payment, who is liable for scratches. The third is the physical layer: long, easily marked sections that must be packed, loaded and lashed in a container. The fourth is delivery: unloading a long box at a building site. A delay in any layer holds up the whole shipment, so each is covered below.

If you are new to the lane, read our general guide to importing from China to Thailand first; this article only adds what is specific to profiles. A forwarder who handles construction cargo, such as the team behind our guide to construction materials and OOG cargo, will recognise most of the issues here.

Is there anti-dumping duty on aluminium profiles from China?

This is the first question to settle, because it changes the landed cost more than freight does. Anti-dumping (AD) duty is an extra duty that Thailand can apply on top of normal import duty when a product from a specific country is found to be sold at less than its normal value and to injure a Thai industry. Our guide to anti-dumping duties on imports into Thailand explains the mechanism in general.

As of November 2026, the DFT's trade-remedy page lists an item for aluminium extrusions (อะลูมิเนียมอัดขึ้นรูป) originating in the People's Republic of China, reference AD1049, with the status "measure in force". An earlier case on the same product, AD1048, is shown as concluded with no measure. The practical reading is that aluminium extrusions of Chinese origin are on the list, and you should not assume your profiles are outside it.

Three points matter in practice. First, the measure follows origin and the named producer or exporter, not the invoice seller. A trading company's invoice does not tell Thai Customs which mill made the sections, so ask the supplier for the producer's name and address in writing. Second, AD measures of this kind commonly set separate duty rates for named producers and a residual rate for everyone else; the exact rates, the product scope and the tariff headings are in the DFT notice itself, and we do not quote them here because they can change through reviews. Third, the scope is defined by the notice's product description and tariff headings. Not every aluminium product made by extrusion is necessarily inside it, and only the official text decides. Ask your customs broker to read the notice against your specification before you place the order.

Because the duty position can change the price comparison with a Thai or non-Chinese supplier, do this check at quotation stage. For a related check on standards, see our guide to TISI mandatory standards for imports; there is a Thai industrial standard for extruded aluminium alloy, TIS 284, but whether any given aluminium product is under a compulsory standard must be confirmed on the TISI website or with TISI directly, and we have not found a basis to say that profiles generally are.

Order of checks before you pay a profile supplier

Five ordered steps: confirm the exact product and alloy, check the Thai trade-remedy list for aluminium extrusions from China, agree the HS code with your broker, agree the Incoterm and packing, then plan the container and loading.
  1. 1

    1. Fix the product

    Section drawing, alloy, temper, length, surface finish

  2. 2

    2. Check the duty list

    Anti-dumping status of the producer on the DFT list

  3. 3

    3. Agree the HS code

    Broker confirms heading and any Form E preference

  4. 4

    4. Agree Incoterm and packing

    Who loads, who lashes, who is liable for scratches

  5. 5

    5. Plan the container

    Length, weight, FCL or LCL, unloading at site

What HS code and documents do aluminium profiles need?

The HS code (Harmonized System code) is the international product code that Thai Customs uses to decide duty and any controls; our guide on what an HS code is covers the basics. Profiles are classified by what they are at the moment of import. A bare extruded section, a section that has been cut, drilled or anodised, and a finished window or door frame can fall under different headings, and a kit of parts can be classified differently from loose sections. The classification therefore depends on the description, the shape, any processing and the intended use, so send the broker the drawing and the specification rather than a one-line product name. If the classification is genuinely unclear, a customs advance ruling can settle it before you ship; see our guide to customs advance rulings in Thailand.

The document set for a profile shipment is the standard China-to-Thailand import set. The commercial invoice must describe the goods fully, and the packing list should give the section code, length, bundle count and weight for every line. The bill of lading comes from the shipping line or forwarder. Form E is the certificate of origin under the ASEAN-China Free Trade Area (ACFTA); when it is valid and the goods qualify, it can support a reduced import duty rate, and our guide to verifying a Form E explains how to check one. Form E supports the normal duty preference only; it does not remove an anti-dumping measure, which is a separate instrument tied to the producer. Our general Thailand import documents checklist lists the rest.

One more document matters for the check in the previous section: the producer's name and address. Put it in the contract and the packing list so the broker can match it to the DFT notice.

Aluminium profiles shipping cargo — photo 1 for Importing Aluminium Profiles from China to Thailand
Aluminium profiles shipping cargo — photo 1 for Importing Aluminium Profiles from China to Thailand — Thai Global Freight

How are aluminium profiles packed for sea freight?

Aluminium is light but soft, and a finished surface is the product. Anodised, powder-coated and wood-grain finishes scratch easily, and a bare mill finish can pick up water stains. Packing therefore does most of the work of protecting value.

The usual structure is a bundle: sections of equal length laid together, separated by paper or foam, wrapped in protective film, and tied with straps. Bundles are often bagged or wrapped in woven or plastic sheet, with end caps or edge guards on exposed corners. Whether bundles go on wooden bearers, in crates or loose on dunnage is a decision for you and the supplier; crates protect better and cost more. If wood is used for bearers or crates, check the wood-packaging rule in our guide to ISPM 15 wood packaging requirements, because untreated wood is a common cause of inspection problems.

Ask the supplier to specify, in the contract, the film type, the interleaving, the strap or band, the labelling of each bundle with section code and length, and whether sections of different finishes are ever mixed in a bundle. A clear bundle label is also what lets a site team find the right section without opening everything.

Moisture needs its own attention. A steel container is a closed box, and temperature swings on a voyage can make water condense inside, a problem explained in our guide to container condensation. Profiles must be dry when packed, the container floor must be dry, and a desiccant is sensible for finished surfaces. Choosing a sound container matters too; our container inspection checklist shows what to look at before loading starts.

Marking the bundles is a small step with a large payoff. Follow the shipping marks approach in our guide to shipping marks for China-Thailand cargo so the bundle labels, the packing list and the consignee's purchase order all use the same codes.

Which container suits long profiles, and when is LCL acceptable?

The deciding number is length, not just weight. Profiles are commonly supplied in lengths of several metres, and the internal length of a standard container sets a hard limit. A 20-foot container has an internal length of roughly 5.9 metres and a 40-foot container roughly 12 metres; our guide to container sizes lists the internal dimensions. If the sections are longer than a 20-foot box, the 40-foot or 40-foot high-cube is the normal choice; our guide to the high-cube container explains the extra height. Ask the supplier for the exact section length and add the clearance a forklift or hand-loading needs.

Weight is the second check. Aluminium is about a third the density of steel, so a container of profiles often fills by volume before it reaches the weight limit. That is useful: you rarely need to worry about overloading, but you do need to avoid wasted space. A container utilisation calculation, such as our container utilisation calculator, helps compare how much cargo fits.

Sections beyond the inside length of a container, or an extremely wide bundle, fall into over-dimensional territory. Then the options are an open-top container, a flat-rack container or breakbulk, and the cost and handling are different; our guides to the open-top container, the flat-rack container and OOG cargo explain them. Most commercial profiles are designed to fit a standard container, so ask the supplier to cut or design to length at the mill instead of paying for special equipment.

FCL or LCL? FCL (full container load) gives you one container and control of loading and sealing; LCL (less than container load) puts your cargo in a shared container. For small lots, LCL can be the sensible choice, but long bundles in a consolidation warehouse are handled several times, and not every consolidator accepts very long items. Our guides to FCL versus LCL, to LCL consolidation and to the minimum CBM on LCL from China help you decide. A practical rule: choose FCL when the profiles are full-length and a meaningful quantity, or when the finish is premium; choose LCL for small, short-length or replacement lots where handling risk is acceptable.

Full container versus shared container for profiles

Two-column comparison. A full container (FCL) gives one shipper control of loading, bundle layout and sealing, and suits full-length profiles in volume. A shared container (LCL) suits small lots but means handling at a consolidation warehouse, more touches and less control over how long sections are laid.

Full container (FCL)

  • One shipper controls loading and sealing
  • Full-length bundles stay together
  • Fewer handling points between factory and site
  • Better fit for project quantities

Shared container (LCL)

  • Suits small trial or repair lots
  • Cargo passes through a consolidation warehouse
  • More lifting and re-stacking of long bundles
  • Very long sections may not be accepted
Aluminium profiles shipping cargo — photo 2 for Importing Aluminium Profiles from China to Thailand
Aluminium profiles shipping cargo — photo 2 for Importing Aluminium Profiles from China to Thailand — Thai Global Freight

How should the container be loaded and lashed?

A container stuffing plan, as described in our guide to container stuffing plans, is a short drawing that shows where each bundle goes. For profiles, three principles matter.

First, support the cargo evenly along its length. Long sections bend if they rest only at the ends or are crushed in the middle. Place bearers or dunnage at regular intervals under every bundle, so the load is spread over the container floor and each bundle stays straight.

Second, keep the cargo from moving. Profiles are slippery when film-wrapped and a bundle that slides during sea motion will scratch itself and its neighbours. Block and brace the bundles against the container walls and the door end, and use lashing straps where the plan calls for them. Dunnage, airbags or timber bracing are common ways to fill gaps. Do not pile heavy items on top of long spans.

Third, record what went in. A loading photo set, taken at each stage and just before the door is closed, is useful evidence if a claim is ever needed; our guide to the loading inspection and to the container seal number explain why the seal number is written on the documents. If the shipment is on FOB or CIF terms, the supplier loads; ask for the photos anyway. If you buy EXW, the loading is arranged by your side, and our guide to EXW factory pickup in China covers how that works.

For mixed loads, such as profiles plus accessories like corner cleats, gaskets and screws, load the accessories in cartons in a separate area, labelled to match the packing list. The cartons are heavier per volume than the sections and should not sit on the profiles.

What goes wrong with profile cargo and how to prevent it

Matrix of four problems: scratches and surface damage prevented by interleaving and film; bending and bow prevented by even support and lashing; water staining and white corrosion prevented by dry packing and desiccant; wrong length or finish prevented by a signed packing list with section codes and a pre-loading check.
ProblemTypical causePrevention
Scratches, surface marksBare bundles rubbing during handling and sea motionProtective film, paper interleaving, edge guards
Bending, bow, twistUneven support, heavy load stacked on long spansEven dunnage under every bundle, tight lashing
Water stain, white corrosionWet cargo, condensation inside a closed boxDry packing, desiccant, dry floor, sound container
Wrong length, finish or quantityPacking list does not name each section codeSection-coded packing list and a check before sealing
Aluminium profiles shipping cargo — photo 3 for Importing Aluminium Profiles from China to Thailand
Aluminium profiles shipping cargo — photo 3 for Importing Aluminium Profiles from China to Thailand — Thai Global Freight

Incoterms: who does what on a profile order?

The Incoterm decides who packs, loads, clears export, pays freight and carries the risk, and for profiles it also decides who answers for surface damage. Under FOB the Chinese seller loads and clears export and your side takes over at the vessel; under CIF the seller also pays freight and insurance to the Thai port, but risk still passes earlier. Under EXW your side collects from the factory, which often means a Thai forwarder organises export clearance in China as well. Under DDP the seller promises delivery with duties paid, which is risky for a duty-sensitive product like aluminium extrusions; our guide to the risks of DDP imports from China explains why.

For first orders, FOB with the supplier's agreed packing standard and a named loading photo set is a common sensible structure, because it keeps loading responsibility with the party who sees the cargo. Our guide to choosing Incoterms for China imports and our Incoterms selector help compare. Whatever you choose, write the packing specification into the contract; the Incoterm alone says nothing about film, interleaving or bundle labelling.

Pay attention to who is the importer of record. If an overseas trader invoices you but a different Chinese mill produced the goods, the AD check applies to the mill. Our guide to China trading companies versus factories explains the distinction, and our guide to pre-shipment inspection of China suppliers shows how a third party can check packing, quantity and finish before the goods leave the factory. For profiles, an inspection at loading is often worth more than one at arrival, because damage found after the seal is closed is hard to prove.

What happens on arrival in Thailand and at the site?

When the vessel arrives at Laem Chabang or another Thai port, the customs broker lodges the import declaration using the invoice, packing list, bill of lading and, if applicable, Form E. Duty and VAT are assessed on the declared value, and our guides to how import duty and VAT are calculated and to paying duty and tax explain the steps. The process as a whole is described in our guide to Thailand import process steps and the customs clearance process. Customs may select a container for inspection or X-ray scanning; see the guide to container X-ray scanning, since profiles in neat bundles scan easily but mismatched descriptions attract questions.

After release, the container leaves the port by truck, and this is where long cargo meets real site conditions. Before the order, ask four questions: Can a truck with a 40-foot chassis reach the site? Is there a flat, firm place to park and unload? Who has the forklift or crane, and can it lift a bundle of this length without bending it? How long will the container sit at the site? A container left waiting for a crew can create detention and demurrage charges; our guide to empty container return and our demurrage and detention estimator explain the clock. If the site cannot take a long container, one option is to unload at a warehouse and deliver shorter, smaller loads; our door-to-door shipping service and our import services can organise that.

On receipt, check against the packing list while the truck is still there: count bundles, check seal number, photograph damage and note it on the delivery document. If anything is wrong, our guide to cargo damaged in transit explains the steps and the time limits to ask your insurer about. Marine cargo insurance should be arranged before shipping, and profiles are worth insuring for the finish, not only for total loss.

Documents and details to hand your broker

Checklist: commercial invoice with a full product description, packing list with section codes, bundle counts and weights, bill of lading or air waybill, Form E when a preference is claimed, producer name and address for the anti-dumping check, and drawings or specification sheets for classification.
  • Commercial invoice with full product description

  • Packing list: section code, length, bundle count, weight

  • Bill of lading or air waybill

  • Form E only when you claim the ACFTA preference

  • Producer name and address, to check the duty list

  • Section drawings or spec sheet for classification

Aluminium profiles shipping cargo — photo 4 for Importing Aluminium Profiles from China to Thailand
Aluminium profiles shipping cargo — photo 4 for Importing Aluminium Profiles from China to Thailand — Thai Global Freight

What is a sensible sequence, and when should you talk to a forwarder?

A sequence that works for a first profile import looks like this. Define the section, alloy, finish and length. Get the producer's name and address. Check the DFT list for the product and producer, and have your broker confirm the HS code and the Form E position. Agree the Incoterm and write the packing standard into the contract. Choose the container from the length and quantity, and ask for a stuffing plan. Arrange insurance. Confirm the site can take the container. Inspect at loading if the value justifies it. Then ship, and clear, and deliver.

Talk to a forwarder before you pay the supplier, not after the goods are booked. A forwarder such as Thai Global Freight can quote FCL and LCL shipping from China, arrange customs clearance in Thailand with a licensed broker, organise consolidation, review the packing list and the loading plan, and deliver door to door, as described in our import services, customs clearance and FCL service pages. For rates and transit time, ask for a quote based on your section length, weight and pick-up location; we do not publish figures here because they depend on the lane and the date. If the cargo might exceed a standard container, ask early so the project-cargo option can be priced against a standard box. Our China-to-Thailand route page outlines the lane, and the landed cost calculator helps you build the total cost including duty and VAT once you know the duty position.

Common Mistakes

  • Assuming the invoice seller is the producer, and skipping the producer check against the DFT anti-dumping list.
  • Sending Customs a one-line product name instead of a drawing and specification, which makes the HS code a guess.
  • Assuming Form E removes anti-dumping duty; it supports a duty preference only.
  • Leaving bundle film, interleaving and labelling out of the contract, then arguing about scratches after arrival.
  • Ordering sections longer than the container can take, or a container the site truck cannot reach.

What You Need to Prepare

  • Section drawings, alloy and finish specification, and exact lengths.
  • The producer's name and address in writing, to check against the DFT list.
  • A licensed customs broker and an importer registration in Thailand.
  • A packing specification in the contract and a section-coded packing list.
  • Confirmation that the site can receive and unload the container, plus cargo insurance.

Frequently Asked Questions

Do I pay anti-dumping duty on aluminium profiles from China?

It depends on the product scope and the producer. As of November 2026, the DFT list shows a measure in force on aluminium extrusions originating in China. Whether your sections are covered, and at what rate for your producer, is decided by the DFT notice, so ask your customs broker to check it against your specification before you order.

Can Form E remove the anti-dumping duty?

No. Form E supports the preferential import duty rate under the ASEAN-China Free Trade Area when the goods qualify. An anti-dumping measure is a separate instrument tied to the origin and the named producer, so the two are assessed separately.

Is a TISI standard mark needed to import aluminium profiles?

There is a Thai standard for extruded aluminium alloy, TIS 284, but whether a given aluminium product is under a compulsory standard must be confirmed with TISI or on its website. We have not found a basis to say that profiles generally are compulsory, so check your product code with TISI before importing.

What size container do I need for 6-metre profiles?

A 20-foot container has an internal length of roughly 5.9 metres, so six-metre sections do not fit in it. A 40-foot container, roughly 12 metres inside, or a 40-foot high-cube is the normal choice. Confirm the exact section length with the supplier and leave room for loading.

Is LCL a good idea for aluminium profiles?

It can work for small, short-length lots. Long bundles are handled several times in a consolidation warehouse and some consolidators do not accept very long items, so for full-length sections and premium finishes, FCL usually offers more control.

How do I avoid scratches and water stains on the finish?

Specify protective film, interleaving paper and edge guards in the contract, pack the sections dry, use a dry and sound container with desiccant, support every bundle evenly, and block and brace the cargo. Ask for loading photos and inspect at loading if the value justifies it.

Who should organise the import: me, my supplier or a forwarder?

A forwarder with a licensed customs broker is the usual choice for a first order, because it covers booking, clearance, delivery and the duty check in one place. Agree the Incoterm first, and talk to the forwarder before you pay the supplier.

Freight Forwarder Thailand

Ready to plan your next shipment?

CallLINEGet a Quote