Skip to content
Sea Freight
Glass weighing scale with a tape measure on top — a simple reminder that VGM is a declared, verified weight that must reach the carrier before the cut-off.Thai Global Freight

What Is VGM Cut-Off, and What Happens If You Miss It?

Container weight (VGM) must be declared before a set deadline or the container may be rolled to the next sailing. Here's why it's strictly enforced.

Author: Bob Kanokphon ThongdeeBob Kanokphon ThongdeeReviewed by: Thai Global Freight Editorial TeamPublished: 2026-08-25Updated: 2026-10-20Last verified: 2026-10-20
On this page
  1. 01What does VGM mean, and why is it required?
  2. 02How is VGM determined: Method 1 or Method 2?
  3. 03Where VGM Cut-Off Sits in the Booking Timeline
  4. 04What happens if VGM isn't submitted in time?
  5. 05Who is responsible for submitting VGM?
  6. 06How can you avoid missing the VGM cut-off?
  7. 07VGM and Other Cut-Offs: Keeping Them Straight
  8. 08VGM for LCL and Multiple-Shipper Containers

Quick Answer

VGM cut-off is the deadline for a shipper to submit a container's Verified Gross Mass (VGM) to the carrier before the container can be loaded. VGM is the total weight of the loaded container, including cargo, packing, and the container's own tare weight, and it is a SOLAS requirement. It can be determined by weighing the whole loaded container (Method 1) or by summing individually weighed components plus the tare weight (Method 2). Without a verified weight on file, terminals generally will not load the container, so it is typically rolled to the next available sailing even if it is already in the yard. The shipper is responsible, even when a third party does the weighing.

Key Takeaways

  • VGM (Verified Gross Mass) is the total weight of a loaded container, including cargo, packing, and the container's own tare weight.
  • VGM must be submitted before the VGM cut-off, or the container generally cannot be loaded onto the vessel.
  • VGM can be determined by weighing the whole loaded container (Method 1) or by summing individually weighed components (Method 2).
  • Responsibility for VGM submission rests with the shipper, even if the physical weighing is done by a trucking company or facility on their behalf.
  • VGM cut-off is enforced strictly because accurate container weight is essential to safe stowage planning and vessel stability.
  • A container that misses VGM cut-off is typically held back and rolled to the next available sailing, even if it's already in the yard.

Among all the cut-offs attached to a sea freight export booking, VGM is the one carriers and terminals treat with the least flexibility. Unlike a documentation deadline that can sometimes be resolved with a late submission or a fee, a missing VGM tends to mean a container simply doesn't get loaded — full stop. That strictness isn't arbitrary; it traces back to a safety requirement written into international maritime law.

Understanding what VGM actually measures, how it's determined, and why the deadline for submitting it is enforced so tightly helps explain why this particular cut-off deserves the same careful tracking as the more visible physical deadlines like CY closing.

Key points about VGM cut-off

Summary panel listing the key points covered in this article on VGM cut-off and verified gross mass declaration.
  • VGM (Verified Gross Mass) is the total weight of a loaded container, including cargo, packing, and the container's own tare weight.

  • VGM must be submitted to the carrier before the VGM cut-off, or the container is generally not permitted to be loaded onto the vessel.

  • VGM can be determined by weighing the whole loaded container (Method 1) or by adding up individually weighed components (Method 2).

  • The shipper is generally the party responsible for ensuring VGM is submitted, even if a forwarder or trucking company physically weighs the container.

  • VGM cut-off is enforced strictly because container and vessel weight distribution directly affects the safety of loading and the ship's stability at sea.

What does VGM mean, and why is it required?

VGM stands for Verified Gross Mass — the total weight of a loaded container, combining the weight of the cargo inside, all packing and dunnage material, and the container's own tare weight (its empty weight as a steel box). It's a requirement under SOLAS, the international Safety of Life at Sea convention, which mandates that a container's verified weight be provided to the carrier before it can be loaded onto a vessel.

The requirement exists because an inaccurate or entirely missing container weight creates real safety risk. Vessels are stowed according to careful weight distribution plans that keep the ship balanced and structurally sound; a container that's significantly heavier than declared, or not accounted for at all, can throw off that plan in ways that affect the vessel's stability, the safe operation of the terminal's lifting equipment, and even road safety once the container moves inland by truck.

How is VGM determined: Method 1 or Method 2?

SOLAS recognizes two accepted methods for arriving at a container's VGM. Method 1 involves weighing the entire loaded and sealed container as a single unit, typically on a calibrated weighbridge or similar certified weighing equipment — this gives a direct, single-measurement result. Method 2 involves weighing the cargo, pallets, and packing materials individually, adding those figures together, and then adding the container's own certified tare weight to arrive at the total.

Which method is used often comes down to what's practical at the point the container is packed. A shipper stuffing a container at a facility with direct access to a certified weighbridge may find Method 1 the more straightforward path. A shipper working from a facility without that equipment, but with reliable weighing of individual items during the packing process, may use Method 2 instead, provided the calculation is carried out through a process recognized by the relevant national authority. Either method, correctly followed, produces a VGM the carrier can rely on.

Method 1 vs. Method 2 for determining VGM

Side-by-side comparison of the two SOLAS-recognized methods for determining a container's verified gross mass — weighing the whole container versus summing individually weighed components.

Method 1

  • Weighs the entire loaded and sealed container as one unit
  • Requires a calibrated and certified weighing device, such as a weighbridge
  • Straightforward but requires access to suitable weighing equipment

Method 2

  • Weighs individual cargo items and packing, then adds the container's tare weight
  • Requires a certified process approved by the relevant authority for this calculation method
  • Useful when a single weighbridge check of the sealed container isn't practical
Container weighing scale port deadline — photo 1 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time?
Container weighing scale port deadline — photo 1 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time? — Thai Global Freight

Where VGM Cut-Off Sits in the Booking Timeline

VGM cut-off is typically set with reference to the terminal's stowage planning process for the vessel, since the declared weight of every container directly feeds into how the terminal decides where each box goes on the ship. In practice, VGM is usually determined once the container has been stuffed and sealed — since the weight has to reflect the final loaded state — and submitted to the carrier by the VGM cut-off stated on the booking confirmation, which may fall before or after the container's physical gate-in at the yard.

Because VGM cut-off, CY closing, and vessel cut-off are all connected to the same underlying loading operation, they tend to cluster around a similar window in the timeline, though they remain separate deadlines that the terminal and carrier track independently. A shipper juggling multiple cut-offs on the same booking benefits from treating VGM as its own line item rather than assuming it's automatically covered once the container physically arrives at the yard.

What happens if VGM isn't submitted in time?

Because VGM is a safety-related requirement rather than a purely administrative one, terminals generally treat the deadline as a hard boundary: without a verified weight on file, a container is not permitted to be loaded onto the vessel, regardless of whether it's already sitting in the yard. This is stricter than how some documentation cut-offs are handled, where a late submission might still be processed with a delay or fee.

A container missing VGM at the point loading operations begin is typically held back and reassigned to the next available sailing on the same route, similar to what happens when a container misses vessel cut-off for other reasons — with the added detail that the shipper first needs to resolve the missing weight declaration before the container can even be considered for that later sailing. This makes VGM one of the cut-offs most worth building extra buffer around, since there's little room to negotiate an exception once the deadline has passed.

VGM submission relative to the booking timeline

Ordered timeline showing when VGM is typically determined and submitted relative to container stuffing, CY closing, and vessel cut-off.
  1. 1

    Container stuffed and sealed

    Cargo is loaded into the container and the door is sealed

  2. 2

    Weight determined

    Using Method 1 (whole-container weighing) or Method 2 (summed components)

  3. 3

    VGM submitted to carrier

    Before the VGM cut-off specific to the booking

  4. 4

    Container gated in at CY

    The terminal accepts the container, now with a declared VGM on file

  5. 5

    Loaded before vessel cut-off

    The terminal uses the declared VGM to plan stowage position on the vessel

Container weighing scale port deadline — photo 2 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time?
Container weighing scale port deadline — photo 2 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time? — Thai Global Freight

Who is responsible for submitting VGM?

The shipper named on the booking is generally the party responsible for ensuring VGM is determined and submitted to the carrier, since SOLAS places the obligation to provide the verified weight on the shipper. In practice, the physical weighing is often carried out by a third party on the shipper's behalf — a trucking company with weighbridge access, a packing warehouse, or the export terminal itself — but the underlying responsibility, and the risk of a missed cut-off, still traces back to the shipper.

When a freight forwarder is involved, VGM submission is commonly handled as part of the forwarder's coordination role, submitting the figure to the carrier on the shipper's behalf once it's been determined. Even so, it's worth a shipper confirming directly with its forwarder how and when VGM will be captured for a given shipment, particularly for a first-time shipper or a shipment using a packing facility that hasn't been used before, rather than assuming it will be handled automatically as part of the booking.

What happens depending on VGM submission timing

Decision tree showing outcomes depending on whether VGM is submitted before cut-off, submitted late, or not submitted at all.
What happens depending on VGM submission timing

VGM submitted before cut-off

Container proceeds normally through gate-in and loading

VGM submitted late but before loading begins

Some terminals may still accept it depending on their process, though acceptance should not be assumed

VGM not submitted at all

The container is generally not loaded and is held for the next available sailing

Container weighing scale port deadline — photo 3 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time?
Container weighing scale port deadline — photo 3 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time? — Thai Global Freight

How can you avoid missing the VGM cut-off?

Building VGM into the shipment plan from the start, rather than treating it as an afterthought once the container reaches the port, is the most reliable way to avoid missing it. That means confirming early which method — Method 1 or Method 2 — will be used, and making sure the necessary weighing equipment or process is actually available and scheduled at the point the container is packed.

It's also worth confirming the specific VGM cut-off time from the current booking confirmation rather than assuming it matches CY closing or a previous shipment's deadline, since VGM cut-off can be set separately and, in some cases, earlier than the physical gate-in deadline. For shipments where weighing depends on a third party — a trucking company or packing facility — getting written confirmation that the weight figure has actually been captured and submitted, rather than assuming it happened, closes a gap that's easy to overlook when several parties are involved in the same booking.

VGM and Other Cut-Offs: Keeping Them Straight

VGM cut-off is easy to lump together mentally with CY closing, vessel cut-off, and SI cut-off, since all four apply to the same export booking and often fall within a similar window of time. But each governs a genuinely different requirement — CY closing governs physical arrival at the yard, vessel cut-off governs final loading onto the ship, SI cut-off governs the paperwork behind the bill of lading, and VGM cut-off governs the declared weight used for safe stowage.

Treating these as one undifferentiated "port deadline" is a common source of last-minute scrambling, since satisfying one doesn't automatically satisfy the others — a container can be physically in the yard, with a submitted SI, and still be blocked from loading because VGM alone wasn't confirmed. Tracking each cut-off on the booking confirmation as its own checklist item, with its own responsible party and its own confirmation step, is what keeps a shipment moving cleanly through all four requirements at once.

Container weighing scale port deadline — photo 4 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time?
Container weighing scale port deadline — photo 4 for What Is VGM Cut-Off, and What Happens If Weight Isn't Submitted in Time? — Thai Global Freight

VGM for LCL and Multiple-Shipper Containers

For an LCL shipment, VGM works a little differently in practice, since the container being weighed holds cargo belonging to several shippers consolidated together. In that case, the console operator or consolidating forwarder is typically the party responsible for arranging the VGM of the fully loaded container, since it's the one physically packing and sealing it — an individual LCL shipper doesn't weigh their own portion separately for VGM purposes, though they still need to provide accurate weight and volume figures for their own cargo as part of their booking.

This is a useful distinction to keep in mind: VGM is a container-level requirement enforced at the point the box is loaded onto the vessel, while the weight and volume a shipper declares for LCL booking purposes is used for freight calculation and space planning within the consolidated box. Both figures matter, but they serve different purposes and are the responsibility of different parties in an LCL arrangement.

Common Mistakes

  • Assuming VGM cut-off is the same as CY closing and not treating it as a separate requirement to track.
  • Assuming a third party (trucking company or packing facility) has submitted VGM without confirming it directly.
  • Not knowing which method (Method 1 or Method 2) will be used until the container is already being packed.
  • Expecting a terminal to make an exception for a late VGM the way some documentation deadlines are handled.

What You Need to Prepare

  • Confirmation of which VGM method (Method 1 whole-container weighing, or Method 2 summed components) will be used
  • Access to certified weighing equipment or a certified calculation process at the point the container is packed
  • The specific VGM cut-off time from the current booking confirmation, checked separately from CY closing
  • Written confirmation from any third party handling the weighing that VGM has actually been submitted to the carrier

Frequently Asked Questions

What does VGM stand for?

VGM stands for Verified Gross Mass: the total weight of a loaded container, combining the cargo, all packing and dunnage material, and the container's own tare weight, which is the empty weight of the steel box. It is the figure a shipper must give the carrier so the vessel can be stowed safely, and it is required under SOLAS before the container can be loaded.

What happens if VGM isn't submitted before cut-off?

The container is generally not permitted to be loaded, because terminals typically will not load a box without a verified weight on file. It is then typically held back and reassigned to the next available sailing on the same route, even if it is already in the yard. The shipper first has to resolve the missing weight declaration before the container can be considered for that later sailing.

What are the two methods for determining VGM?

Method 1 weighs the entire loaded and sealed container as a single unit, typically on a calibrated weighbridge or other certified weighing equipment, giving one direct measurement. Method 2 weighs the cargo, pallets, and packing materials individually, adds those figures together, and then adds the container's certified tare weight. Method 2 must follow a process recognized by the relevant national authority.

Who is responsible for submitting VGM?

The shipper named on the booking is generally responsible for making sure VGM is determined and submitted, because SOLAS places the obligation to provide the verified weight on the shipper. The physical weighing is often done by a trucking company, packing facility, or terminal on the shipper's behalf, and a forwarder commonly submits the figure, but the risk of a missed cut-off still traces back to the shipper.

Why is VGM cut-off enforced so strictly compared to other cut-offs?

Because VGM is a safety requirement under SOLAS rather than a purely administrative one. Vessels are stowed to careful weight distribution plans, and an inaccurate or missing container weight can affect vessel stability, terminal lifting equipment, and road safety inland. Terminals therefore generally do not load a container without a verified weight on file, whereas some documentation cut-offs can be handled with a late submission or a fee.

Is VGM cut-off the same time as CY closing?

Not necessarily. VGM cut-off is a separate deadline that can be set apart from CY closing and, in some cases, falls earlier than the physical gate-in deadline. A container can be physically in the yard and still be blocked from loading because VGM alone was not confirmed. Check each cut-off time on the current booking confirmation rather than assuming they match.

Freight Forwarder Thailand

Ready to plan your next shipment?

CallLINEGet a Quote