Thai Global FreightExporting Used Machinery from Thailand: A Seller Guide
Exporting used machinery from Thailand as of November 2026: which approvals apply, dismantling and packing, container or flat rack, Incoterms and paperwork.
On this page
- 01Can you export used machinery from Thailand, and what decides the answer?
- 02What does Thai Customs need for a used-machinery export?
- 03Which approvals can apply to used machinery?
- 04How is used machinery dismantled and packed for export?
- 05Closed container, flat rack or break-bulk: which mode fits?
- 06Who does what: seller, buyer and forwarder?
- 07What goes wrong with used-machinery exports, and how to prevent it?
- 08What should the seller do step by step, and when to talk to a forwarder?
Quick Answer
Exporting used machinery from Thailand means classifying the machine under an HS code, checking whether any approval applies (for example a Thailand Board of Investment approval if the machine was bought with BOI privileges, or a Department of Foreign Trade check for dual-use items), preparing an accurate invoice and packing list, dismantling and packing it with a marked inventory, and filing an export declaration with the Thai Customs Department before the goods move to the export station. Choose a closed container when the machine breaks down to fit the door, and a flat rack when pieces are too large. As of November 2026, confirm the rules for your exact machine with your customs broker.
Key Takeaways
- Used machinery has no special customs category by itself; what decides the paperwork is the HS code, the machine's function and whether it was bought with BOI privileges.
- BOI lists a separate form to apply for permission to export machinery that received tax and duty privileges, so a promoted company should not ship before that is settled.
- Thai Customs requires the export declaration to be submitted before the goods move to the export customs station, with the invoice, packing list and any permit.
- A marked inventory and photos of every module are what make reassembly, insurance claims and customs questions manageable later.
- Choose the container type from the dismantled dimensions, not from the machine's assembled size, and agree who pays for dismantling, packing and insurance in the Incoterm.
Can you export used machinery from Thailand, and what decides the answer?
In most cases yes, and the machine being used does not by itself make it a special category at Thai customs. What decides your paperwork is a short list of facts: the Harmonized System (HS) code that classifies the machine, what the machine can do, who owns it and how it was originally acquired, and where it is going. This guide is written as of November 2026 for a Thai seller who has a machine to sell abroad and needs to dismantle, pack and ship it, not just sign a sale contract.
Two terms first. An HS code is the international product classification number that customs uses to identify goods; for machinery it sits in the machinery chapters of the tariff. An export declaration is the electronic filing that tells the Thai Customs Department what is leaving, in what quantity and at what value. A customs broker (ชิปปิ้ง) is the licensed party that files it for you.
The work splits into four jobs that different people do: checking whether any approval applies, preparing the commercial paperwork, physically dismantling and packing the machine, and moving it to the port with the right equipment. A used-machinery sale goes wrong when these four are treated as one task assigned to one person. The seller who sells ex-works to a foreign buyer still needs someone to lift, crate and load; the buyer who thinks the seller handles everything may never have agreed who pays for the crane.
This article follows the sequence a seller meets. For the general export routine, read our export process steps and the export documents checklist; for the moving and rigging side, see planning factory machine relocation logistics and the heavy-lift cargo guide. The sections below add what is specific to selling a used machine abroad.
What does Thai Customs need for a used-machinery export?
Thai Customs describes the export routine on its website. The exporter prepares the export declaration electronically and submits it to the customs computer system before moving the goods to the export customs station. If the system finds no errors it returns a declaration number. The page lists four ways to submit: yourself if you are registered, through a customs broker, through a service counter, or on paper with a pre-keying sheet at the export station. The documents to have ready are the invoice, the packing list, and any permit or licence if the goods are controlled or restricted for export. Duties and fees, if any, are paid after the declaration number is issued and before inspection. The page is written for exports by land, so treat it as the Customs Department's description of the declaration logic and let your broker confirm the sea or air specifics.
For used machinery, three points in the declaration need care. The first is classification: the HS code follows what the machine is and does, so a used CNC lathe and a new one share a classification. The second is description: the invoice and packing list should say used or second-hand, give make, model, serial number and year where known, and match the crates one for one. The third is value: the declared value should be the real sale price, with the same figure on the commercial invoice the buyer will use at destination. A low figure to ease the buyer's import is a risk for both sides and not something a broker should be asked to file.
A machine dismantled into twenty crates is still one sale. Decide with your broker whether it goes on one declaration with a detailed packing list or several, because the physical lots may travel on different dates. Whatever you choose, every crate needs to appear on the packing list with a number, dimensions and gross weight, so that an officer who selects the shipment for inspection can match a box to a line.
The Customs Department also states that exporting prohibited goods, or restricted goods without the permit, is an offence under the Customs Act B.E. 2560 (sections 244 and 246 are cited on its page). That is why the approval check in the next section comes before packing, not after.
From sale agreement to export customs clearance
- 1
Confirm HS code and approvals
BOI, dual-use, goods-specific agencies
- 2
Prepare invoice and packing list
Describe each module or crate
- 3
Dismantle and pack
Marked inventory and photos
- 4
Submit export declaration
Before goods move to the customs station
- 5
Pay any duties and fees, inspection if selected
- 6
Load, lash and ship
Which approvals can apply to used machinery?
The honest answer is that it depends on three things, and as of November 2026 we did not find a rule that requires a permit simply because a machine is second-hand. Confirm this for your machine; do not assume it either way.
The first and most common is BOI status. The Thailand Board of Investment publishes forms for machinery use under a promotion certificate. Among them are an application for permission to sell, transfer or donate machinery (form code F IN MC 04-03) and an application for permission to export machinery that has been granted tax and duty exemption or reduction (F IN MC 06-03). If your company is promoted and the machine was imported or bought with those privileges, check with BOI before you agree a sale to a foreign buyer. The privilege usually carries conditions, and a bank security deposit or an unfinished obligation can be tied to the machine. A buyer who needs the machine quickly will not want to learn about this after the crates are built.
The second is dual-use. The Department of Foreign Trade announced that the Ministry of Commerce issued two announcements in B.E. 2569 on controlling dual-use items, which are goods with both civil and strategic uses. From 30 June 2026 exporters can apply for licences in advance, and from 30 July 2026 permit requirements take effect for nuclear-related items in Category 0. Most ordinary factory machines are not in scope, but some precision machine tools, electronics equipment and test equipment can be. Ask your broker to check the machine's specification against the Department's announcements and its dual-use licensing system before you commit to a delivery date.
The third is goods-specific rules. If the machine processes food, medicines, chemicals, radiation sources or anything similar, or contains regulated parts such as refrigerants, batteries or radioactive sources, the responsible agency for that item may require its own permit or declaration. Customs lists restricted goods as those exportable only with a permit or after meeting the requirements of the relevant law, and names no single agency for all of them. So the question to ask is which agency governs this specific item, not whether machinery in general needs a permit. The permits-by-agency and controlled-goods guides on this site map the common cases.
Which check applies to which situation
| Situation | Who to ask | Why it matters |
|---|---|---|
| Machine imported or bought with BOI privileges | Thailand Board of Investment | Privileged machinery has its own export and transfer approval |
| Machine that could have a dual-use function | Department of Foreign Trade | Dual-use export permits are being phased in during 2026 |
| Machine or part classed as restricted | The agency named for that goods type | Exporting restricted goods without a permit is an offence |
| Ordinary used machine, no special status | Your customs broker | Correct HS code and an honest declaration |

How is used machinery dismantled and packed for export?
Dismantling is where most of the value is protected or lost. The aim is to produce pieces that the buyer can reassemble without guessing, that fit the chosen equipment, and that survive handling and weather.
Start with documentation before any bolt is loosened: photograph the machine whole, then every connection point, wiring terminal, hose and gauge. Record the serial plate and any software or controller version. Keep a short written sequence of what comes off first. Give every module a number on a durable tag, and put the same number on the packing list. Colour-coded tape on wiring and hoses, with a matching mark on the terminal, saves the buyer's technician days.
Drain and make safe. Oils, coolants, hydraulic fluid and fuel are drained, and the drained quantities and disposal are the seller's responsibility. Residual fluids can make cargo dangerous goods or cause leaks that damage everything below; if a machine still holds anything hazardous, tell the forwarder before booking, because dangerous goods have their own carrier acceptance rules. Batteries, pressure vessels and springs under load need specific handling.
Protect bare metal. Unpainted machined surfaces such as slides, spindles and gear faces are coated with a rust-preventive and wrapped. Sea air is humid and a month in transit with condensation can undo years of care. Desiccant and vapour-barrier wrap are common in crate design, but the specification is something to agree with your packer rather than a rule to quote.
Crate for the route. Fragile modules such as control cabinets, glass, sensors and drives go in cushioned crates with shock indicators if the buyer wants them. Heavy modules ride on skids with lifting points, and the crate marks show the centre of gravity. Timber used for crates and pallets can be subject to treatment requirements at the destination, so ask the buyer which phytosanitary or fumigation marking their import rules need, and see our fumigation certificate guide.
Finally, check dimensions against the equipment. A module that is a few centimetres too tall for a container door or roof is the commonest reason a booking collapses at the last moment. Measure the packed crate, not the bare module, and give the forwarder length, width, height and gross weight per piece.

Closed container, flat rack or break-bulk: which mode fits?
Choose from the dismantled dimensions and the heaviest single piece, not from how the machine looked on the factory floor. Three outcomes are common.
When the machine breaks down into crates that fit through the door and under the roof of a closed container, use a closed container. It gives weather protection and the simplest booking. The skill is in the load plan: heavy pieces low and centred, blocking and bracing so nothing moves under braking or rolling, and a packing list that follows the load order. Our container utilization calculator and CBM calculator help check that the pieces and the box are compatible.
When at least one piece is too tall, wide or heavy to dismantle further, a flat rack becomes the option. A flat rack is a container platform with end walls but no sides or roof, so tall or wide cargo can overhang within the carrier's limits. Cargo that exceeds the standard container envelope is called out-of-gauge (OOG) cargo. It is loaded by crane, lashed to fixed points on the rack, and the carrier must approve the dimensions in advance. See what is a flat rack container and what is OOG cargo for the mechanics.
When pieces are very large, or the machine is wheeled, break-bulk or roll-on/roll-off (RoRo) services can apply. Used vehicles and wheeled equipment are covered in exporting used pickup trucks, RoRo versus container; for tracked or wheeled industrial machines the same logic applies. These options depend on the destination port's handling capacity and the carrier's schedule, so decide early.
A decision rule helps. Choose a closed container when every piece fits the door and roof and the machine tolerates enclosed transit. Choose a flat rack when one or more pieces exceed those limits but a crane can lift them. Choose break-bulk or RoRo when the piece exceeds rack limits or is self-propelled and the lane has the service. Ask for a quote on each option rather than guessing which will be lower, because OOG surcharges and special equipment make the comparison non-obvious.
Two practical notes. Air freight can carry small high-value modules such as control units or spare parts when the buyer needs a quick start-up, but it is not for the main body. And do not forget the Thai leg: factory to port often needs a low-bed trailer or a crane at pickup, and moving permits for oversize loads on public roads are a separate matter from export customs, so confirm with your forwarder who arranges them.
Closed container versus flat rack for used machinery
Closed container
- Machine dismantled into modules that fit the door
- Cargo protected from rain and spray
- Blocking and bracing done inside the box
- Usually the simpler booking
Flat rack
- For pieces too large or heavy to dismantle further
- Loaded by crane, lashed to the rack points
- Cargo exposed, so wrapping and covers matter
- Out-of-gauge planning with the carrier
Who does what: seller, buyer and forwarder?
The Incoterm decides who carries each cost and risk, but it does not do the dismantling for you. Incoterms, the standard trade terms published by the International Chamber of Commerce, describe delivery points, not who hires the rigger.
Under Ex Works (EXW), the seller makes the machine available at its premises and the buyer arranges loading, export clearance and everything after. In practice, with used machinery, EXW often fails because the buyer cannot lift the crates at a Thai plant or file Thai export declarations. If the buyer insists, check who is the exporter of record on the declaration, and read what is an exporter of record. Under Free Carrier (FCA) or Free On Board (FOB), the seller is responsible for export clearance and for getting the goods to the named point, which is usually the more workable split for a seller who can handle the Thai side. Under a term where the seller books the main carriage, such as CIF or CFR, the seller carries more tasks and should reflect them in the price. Use our Incoterms selector when you need to compare.
Write down five items beyond the Incoterm. Who pays for dismantling and packing, and to what specification? Who supplies the crane, forklift and trailer at the factory? Who insures the cargo, and from which point? Who handles destination import clearance and duties? And what does the buyer accept as proof that the machine was working when it left, such as a recorded test run or inspection by the buyer's own technician before dismantling? A sale of used machinery is often an as-is sale, so the contract should say what as-is means.
On insurance, the carrier's liability is limited and does not cover everything, as the carrier liability versus cargo insurance article explains. A machine being lifted, lashed and shipped across the ocean is the kind of cargo where all-risks cover is worth pricing, and the policy should name the full value and the transit from the factory gate. Our cargo insurance and Incoterms-and-insurance guides cover the structure.
The forwarder's role is to join these pieces: confirm the equipment, book the carrier, coordinate trucking and cranes, prepare the declaration with the broker, and keep the paperwork consistent across the booking, packing list and invoice. The seller's role is to supply truthful data early and decide quickly when a dimension or approval turns up a problem.

What goes wrong with used-machinery exports, and how to prevent it?
Most problems are visible in advance if someone looks. These are the failures we would plan against.
Approval found late. A promoted company discovers after the sale that the machine needed BOI permission, and the shipment waits while an application runs. Prevent it by checking BOI status and the machine's origin before quoting a delivery date.
Description mismatch. The invoice says one machine, the packing list lists parts that do not obviously belong to it, and the crates say something else. An officer who selects the shipment for inspection finds the difference. Prevent it by building the packing list from the numbered crates after packing, not from the sales quotation.
Oversize discovered at the gate. The crate that was measured as a bare module no longer fits when it is on a skid. Prevent it by measuring the finished crate and sending dimensions to the forwarder before the carrier booking is confirmed.
Water and rust. A machine shipped on a flat rack with a thin cover arrives with rust on every machined surface. Prevent it with rust-preventive coating, a proper cover and, where the buyer cares, a sealed barrier wrap.
Unclear as-is terms. The buyer says the machine did not work on arrival; the seller says it worked in the factory. Prevent it with a recorded test run before dismantling, photos at each stage, and a contract that defines condition at handover.
Missing reassembly information. The buyer receives forty crates and no drawings. Include the manuals, wiring diagrams and the dismantling sequence in a waterproof folder with the first crate, and keep a copy by email.
Customs value too low. A declared value that does not match the invoice used at destination invites queries at both ends. Prevent it by using the same commercial invoice for both.
Cost allocation arguments. The invoice excludes crane hire, which the buyer expected the seller to pay. Prevent it by listing each cost line and who bears it before signing.
A delay in the shipment also has a financial side. Free time at the terminal and on containers is limited, and if the paperwork is not ready when the cargo arrives at the port, storage and container charges can begin. Our guide on demurrage, detention and storage explains the mechanics, and the planning lead times article helps set a realistic timeline.
Seller checklist before the machine leaves the plant
Ownership and BOI status confirmed in writing
HS code agreed with the customs broker
Every module numbered and photographed before and after dismantling
Oil, coolant and fuel drained, hazards declared
Invoice and packing list match the physical crates
Wiring, hoses and fasteners marked for reassembly
Incoterm and insurance agreed with the buyer

What should the seller do step by step, and when to talk to a forwarder?
A workable order for a Thai seller looks like this. First, confirm ownership, any BOI status and the machine's specification, and ask the broker for the HS code. Second, check whether dual-use or goods-specific approvals apply, with the agency concerned, and write down the answer. Third, agree the Incoterm and the cost split with the buyer, including dismantling, packing, crane, insurance and destination clearance. Fourth, get a dimensioned plan of the dismantled pieces and send it to the forwarder for a choice between container, flat rack or another mode. Fifth, dismantle and pack with numbered modules, photos and a packing list. Sixth, have the broker submit the export declaration before the goods move to the export station, pay any duties and fees, and respond to inspection if the shipment is selected. Seventh, load, lash, ship, and send the buyer the documents they need for destination import. Keep the checklist figure above with the project file.
Talk to a forwarder early, ideally before you sign the sale contract. Thai Global Freight can help with the parts that need coordination: project cargo planning for heavy or out-of-gauge pieces, FCL and sea freight booking, export services and customs clearance through licensed brokers, trucking from the plant to the port, and door-to-door arrangements where the buyer wants delivery to their site. We do not state rates or transit times in guides because they depend on the lane, the pieces and the season; the right step is to send the dimensions, weights, origin and destination and ask for a quote. If your machine has an approval question, we will tell you which agency to confirm it with rather than assume an answer.
For industry context, see our industrial machinery freight page. If you are on the buying side of a used-machinery deal, importing used excavators from Japan and importing machinery from China show the mirror-image import issues. If the machine moves to a new Thai site instead, planning factory machine relocation logistics is the closer fit.
Common Mistakes
- Agreeing a delivery date before checking BOI status, dual-use scope and goods-specific permits.
- Building the packing list from the sales quotation instead of from the numbered, physical crates.
- Measuring bare modules instead of finished crates, then finding the pieces do not fit the container or the carrier's limits.
- Declaring a value on the export declaration that differs from the invoice the buyer uses at destination.
- Shipping an EXW sale of heavy machinery without anyone responsible for lifting, loading and Thai export clearance.
- Leaving oils and fluids in the machine and discovering at booking that the cargo counts as dangerous goods.
What You Need to Prepare
- Proof of ownership of the machine and, for a promoted company, the BOI status and any open conditions on that machine.
- The make, model, serial number, year and technical specification, so the broker can classify it and check dual-use scope.
- A commercial invoice and a packing list that describe the machine as used and match the numbered crates.
- Dimensions and gross weight of each packed piece, and a note of the heaviest and tallest piece.
- A licensed customs broker with a power of attorney, and any permit or approval confirmed by the responsible agency.
- A written agreement with the buyer on Incoterm, cost split, insurance, condition at handover and destination clearance.
Frequently Asked Questions
Do I need a special permit to export used machinery from Thailand?
As of November 2026 we found no rule that requires a permit simply because a machine is second-hand. What matters is the machine itself: whether it was bought with BOI privileges, whether it is a dual-use item, and whether it contains goods regulated by a specific agency. Ask your customs broker to check these for your exact machine.
My company has BOI privileges. Can I just sell the machine abroad?
Not before checking with BOI. The Board of Investment lists forms to apply for permission to sell, transfer or donate machinery and to export machinery that received tax and duty privileges. Conditions and security deposits may be attached to the machine, so settle that first and keep the written approval with the shipment file.
When do I file the export declaration?
The Thai Customs Department describes the exporter submitting the declaration electronically before the goods move to the export customs station, then receiving a declaration number if the system finds no errors. Your customs broker normally files it for you, so send final packing data in time for them to do so.
Should the invoice say the machine is used?
Yes. Describe it as used or second-hand with make, model, serial number and year where known. A clear description helps classification, avoids a mismatch with the packing list and gives the buyer a document that agrees with what arrives at their import clearance.
Container or flat rack: how do I decide?
Decide from the dimensions of the packed pieces. If every crate fits through the door and under the roof, a closed container is simpler and protects from weather. If one piece is too tall, wide or heavy to dismantle further, a flat rack loaded by crane is the usual option, with the carrier approving the out-of-gauge dimensions first.
Who should insure the machine in transit?
It depends on the Incoterm, but whoever carries the risk should insure. Carrier liability is limited, so a machine of real value is usually worth an all-risks quote covering the full value from the factory gate. Agree this in the contract rather than assuming it.
Can I ship a machine that still has oil in it?
Drain it where you can. Residual fluids can leak and damage other cargo, and they may make the shipment dangerous goods, which carriers handle under separate rules. If anything hazardous must stay in the machine, tell your forwarder before booking so the shipment is declared and accepted correctly.
Sources
- Thai Customs Department: export procedure for goods
- Thai Customs Department: prohibited and restricted goods for import and export
- Thailand Board of Investment: forms for incentive utilization (machinery use, sale, transfer and export)
- Department of Foreign Trade: announcements on dual-use items B.E. 2569